The material register

Sampled, sourced, recorded

Life at the works.

Every material in the building, laid out like a sample board — where it comes from and where you will find it. Below, one Saturday, hour by hour.

Limewashed plaster

Somerset lime, slaked on site in the old loading yard

Every wall in the kiln hall residences, four coats, burnished by hand

Reclaimed 1864 stock brick

Salvaged from the fallen western range during remediation — 11,200 cleaned by hand

Repairs to the retained kiln hall walls, laid where the original was struck

Staffordshire blue engineering brick

Chesterton Works, Stoke-on-Trent

The new wing’s plinth and the rebuilt canal edge

Quarter-sawn English oak

Wykeham Estate, North Yorkshire, air-dried three years

Floors in 180mm boards, stair treads, wardrobes and window seats

Penrhyn slate

Bethesda, North Wales

The roof of the retained kiln hall range, laid in diminishing courses

Unlacquered brass

Cast and finished in Birmingham’s Jewellery Quarter

Ironmongery, switch plates and kitchen taps — left to darken where hands go

Purbeck limestone

Quarried on the Isle of Purbeck, Dorset

Lobby floors, thresholds and window cills throughout both wings

Kiln terrazzo

Cast in Yorkshire with lime aggregate recovered from the calcining floor

Bathroom floors in every residence — the building, ground and set

Galvanised steel glazing

Thermally broken sections, fabricated in Sheffield

The hopper windows of the kiln hall and the new wing’s water-facing screens

Lime mortar

Matched by eye and then by analysis to the 1864 original

All repointing across 340 linear metres of retained elevation

No. 02 — A Saturday at The Limeworks

07:30

The towpath belongs to you, a rower’s wake, and one unhurried heron. Coffee from the hatch at Ropewalk on the way back.

09:30

The queue at Gauge Street Bakery moves at the speed of conversation. Take the second loaf; the first never survives the walk.

12:30

The summer hang at the Boilerhouse, then lunch on The Dredger’s wharf terrace while the narrowboats sort themselves out.

15:30

Home through the lime garden. An hour on the window seat while the light works its way across the flue wall.

19:00

Friends arrive by tram, six minutes from town, and claim the long table. Windows open; the water does its evening work.

22:30

The Basin goes quiet the way it has for a century and a half — early, completely, and without being asked.

Register your interest.

The register is the only list we keep. It is not a marketing database — it is the order in which we call people when a residence is released, and the way we send the plates. Joining it commits you to nothing except hearing from us occasionally, in writing, when there is something worth saying.

The material register

Sampled, sourced, recorded

Life at the works.

Every material in the building, laid out like a sample board — where it comes from and where you will find it. Below, one Saturday, hour by hour.

Limewashed plaster

Somerset lime, slaked on site in the old loading yard

Every wall in the kiln hall residences, four coats, burnished by hand

Reclaimed 1864 stock brick

Salvaged from the fallen western range during remediation — 11,200 cleaned by hand

Repairs to the retained kiln hall walls, laid where the original was struck

Staffordshire blue engineering brick

Chesterton Works, Stoke-on-Trent

The new wing’s plinth and the rebuilt canal edge

Quarter-sawn English oak

Wykeham Estate, North Yorkshire, air-dried three years

Floors in 180mm boards, stair treads, wardrobes and window seats

Penrhyn slate

Bethesda, North Wales

The roof of the retained kiln hall range, laid in diminishing courses

Unlacquered brass

Cast and finished in Birmingham’s Jewellery Quarter

Ironmongery, switch plates and kitchen taps — left to darken where hands go

Purbeck limestone

Quarried on the Isle of Purbeck, Dorset

Lobby floors, thresholds and window cills throughout both wings

Kiln terrazzo

Cast in Yorkshire with lime aggregate recovered from the calcining floor

Bathroom floors in every residence — the building, ground and set

Galvanised steel glazing

Thermally broken sections, fabricated in Sheffield

The hopper windows of the kiln hall and the new wing’s water-facing screens

Lime mortar

Matched by eye and then by analysis to the 1864 original

All repointing across 340 linear metres of retained elevation

No. 02 — A Saturday at The Limeworks

07:30

The towpath belongs to you, a rower’s wake, and one unhurried heron. Coffee from the hatch at Ropewalk on the way back.

09:30

The queue at Gauge Street Bakery moves at the speed of conversation. Take the second loaf; the first never survives the walk.

12:30

The summer hang at the Boilerhouse, then lunch on The Dredger’s wharf terrace while the narrowboats sort themselves out.

15:30

Home through the lime garden. An hour on the window seat while the light works its way across the flue wall.

19:00

Friends arrive by tram, six minutes from town, and claim the long table. Windows open; the water does its evening work.

22:30

The Basin goes quiet the way it has for a century and a half — early, completely, and without being asked.

Create a free website with Framer, the website builder loved by startups, designers and agencies.